Single award · grant

Purchase New Self-Propelled Trainsets That Do Not Require Construction and Maintenance of Wayside Power for…

Award ID: IL-2025-009

FY2025 · complete year · data as of 2026-09-01

A single federal award, with both ends of the trail linked.

$101.6M
Total award value

Award IL-2025-009 is a grant from the Department of Transportation to Northeast Illinois Railroad CO, $101.6M obligated, FY2025 to FY2033, for Purchase New Self-Propelled Trainsets That Do Not Require Construction and Maintenance of Wayside…. The work is performed in Illinois. Source

Description

Application Purpose: The Purpose of This Project Is to Purchase New Self-Propelled Trainsets That Do Not Require Construction and Maintenance of Wayside Power for Use in Metra Passenger Service.; Activities Performed: This Grant Will Partially Fund the Purchase of 8 Battery Electric Trainsets and Charging Infrastructure.; Expected Outcomes: Metra Will Replace Diesel Locomotive Hauled Train Runs in Service Along the Rock Island Line Beverly Branch Which Is a Densely Populated Corridor with Closely Spaced Stations. Battery Trainsets Will Have Increased Operational Efficiency for Frequent Acceleration and Deceleration Than the Existing Locomotives. The Air Quality Along the Corridor Will Be Improved by the Reduction of Diesel Locomotive Emissions. The Project Would Enable More Frequent Off-Peak Service Along the Corridor.; Intended Beneficiaries: Metra Commuters and Employees Will Benefit from Increased Speed and Efficiency and from Reduced Exposure to Hydrocarbon Carbon Monoxide NOX and Particulate Emissions in Stations and Terminals. Residents of Historically Disadvantaged Communities and Sensitive Populations Along the Rock Island Line in the South Side of Chicago Will Benefit from Direct Emissions Reduction.; Subrecipient Activities: Not Applicable

Award details

Award typeGrant
FAINIL-2025-009
Action date2025
Period96 mo
Place of performanceIllinois →
Category—
Competed?Not recordedSource
Total (exact)$101,599,137

More awards to Northeast Illinois Railroad CO

awarded 2022$513.8M
awarded 2023$264M
awarded 2026$249.7M

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.