Proposed Project Involves Final Design and Construction Activities for Track, Bridge, Signal, and Other Rail…
FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†
† DoD contract data posts to USAspending about 90 days after award.
A single federal award, with both ends of the trail linked.
Award 69A36526421450FSPDC is a grant from the Department of Transportation to National Railroad Passenger Corporation, $14.9M obligated, FY2026 to FY2028, for Proposed Project Involves Final Design and Construction Activities for Track, Bridge, Signal, and…. The work is performed in Montana. Source
Description
The Proposed Project Involves Final Design and Construction Activities for Track, Bridge, Signal, and Other Rail Infrastructure Improvements on Burlington Northern Santa Fe Railways (Bnsf) Tracks in the Malta, MT, Area and at the Amtrak Malta Station, Where Amtrak Empire Builder Long-Distance Service Operates. The Project Will Also Improve Safety and Reliability. Intended Beneficiaries: Amtrak, Bnsf, and the Communities Along the Bnsf Milk River Subdivision in the Towns of Malta and Bowdoin Siding in Phillips County, Montana.