Single award · contract
MQ-4C Triton LRIP 4 Long Lead Items
Award ID: N0001918C1028
A single federal award, with both ends of the trail linked.
$378.6M
Total award value
Award N0001918C1028 is a contract from the Department of Defense to Northrop Grumman Systems Corporation, $378.6M obligated, FY2018 to FY2024, for MQ-4C Triton LRIP 4 Long Lead Items. The work is performed in California. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1550 (Unmanned Aircraft). Source
Agency ›
Department of Defense
Source
awarded→$378.6M
Award details
Award typeContract
PIIDN0001918C1028
Action date2018
Period69 mo
Awarding agencyDepartment of Defense →
Place of performanceCalifornia →
CategoryNAICS 336411PSC 1550
Competed?Not recordedSource
Total (exact)$378,619,959
More awards to Northrop Grumman Systems Corporation
awarded 2008$3.2B
awarded 2014$720.2M
awarded 2015$711.2M
awarded 2014$635M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.