Single award · contract

MQ-4C Triton LRIP Lot 5 Long Lead Items to Support U.S. Navy and Cooperative Partner Australia

Award ID: N0001919C0008

A single federal award, with both ends of the trail linked.

$1.8B
Total award value

Award N0001919C0008 is a contract from the Department of Defense to Northrop Grumman Systems Corporation, $1.8B obligated, FY2019 to FY2029, for MQ-4C Triton LRIP Lot 5 Long Lead Items to Support U.S. Navy and Cooperative Partner Australia. The work is performed in California. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1550 (Unmanned Aircraft). Source

Description

MQ-4C Triton LRIP Lot 5 Long Lead Items to Support U.S. Navy and Cooperative Partner Australia.

Award details

Award typeContract
PIIDN0001919C0008
Action date2019
Period116 mo
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$1,810,662,428

More awards to Northrop Grumman Systems Corporation

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.