Single award · contract

For MQ-4C Triton LRIP 1 Unmanned Aircraft Long Lead

Award ID: N0001915C0002

A single federal award, with both ends of the trail linked.

$711.2M
Total award value

Award N0001915C0002 is a contract from the Department of Defense to Northrop Grumman Systems Corporation, $711.2M obligated, FY2015 to FY2025, for For MQ-4C Triton LRIP 1 Unmanned Aircraft Long Lead. The work is performed in California. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1550 (Unmanned Aircraft). Source

Description

Igf::ot::igf the Purpose of This Procurement Is for MQ-4C Triton LRIP 1 Unmanned Aircraft Long Lead

Award details

Award typeContract
PIIDN0001915C0002
Action date2015
Period118 mo
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$711,229,373

More awards to Northrop Grumman Systems Corporation

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.