Single award · contract

MQ-4C Triton LRIP 3 Long Lead Items

Award ID: N0001917C0018

A single federal award, with both ends of the trail linked.

$404M
Total award value

Award N0001917C0018 is a contract from the Department of Defense to Northrop Grumman Systems Corporation, $404M obligated, FY2017 to FY2024, for MQ-4C Triton LRIP 3 Long Lead Items. The work is performed in California. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1550 (Unmanned Aircraft). Source

Description

Igf::ot::igf MQ-4C Triton LRIP 3 Long Lead Items

Award details

Award typeContract
PIIDN0001917C0018
Action date2017
Period85 mo
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$404,031,432

More awards to Northrop Grumman Systems Corporation

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.