Single award · contract

Lot 9 Basic Contract with Selected Long Lead

Award ID: FA862009C4001

A single federal award, with both ends of the trail linked.

$186.9M
Total award value

Award FA862009C4001 is a contract from the Department of Defense to Northrop Grumman Systems Corporation, $186.9M obligated, FY2009 to FY2014, for Lot 9 Basic Contract with Selected Long Lead. The work is performed in California. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source

Award details

Award typeContract
PIIDFA862009C4001
Action date2009
Period60 mo
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$186,882,002

More awards to Northrop Grumman Systems Corporation

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.