● Single award · grant
I-5: Columbia River (Interstate) Bridge
FY2020 · complete year · data as of 2026-07-12
A single federal award, with both ends of the trail linked.
$183.5M
total award value
2020
action date
187 mo
period
693JJ22440008YP27ORS001533BIPL
FAIN
Description
Project Title: I-5: Columbia River (Interstate) Bridge :::: Project Description: Planning, Design, Right of Way, and Utility Relocation for the Replacement of the I-5 Interstate Bridge Between Oregon and Washington. Replacing the Bridge Is Anticipated to Improve Traffic and Mobility for Freight and the Public Traveling Across the River. Project Also Includes Right of Way Acquisition for the Demolition of the Current Interstate Bridge.
Awarding agencyDepartment of Transportation →
Place of performanceOregon →
Category—
Competed?Not recordedSource
Total (exact)$183,457,000
More awards to Oregon Department of Transportation
awarded 2026$362.7M
More from Department of Transportation
awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
awarded 2020$4B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.