I-5: Columbia River Bridge Replacement
FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†
† DoD contract data posts to USAspending about 90 days after award.
A single federal award, with both ends of the trail linked.
Award 693JJ22440008YP27ORS001572BIPL is a grant from the Department of Transportation to Oregon Department of Transportation, $362.7M obligated, FY2026 to FY2035, for I-5: Columbia River Bridge Replacement. The work is performed in Oregon. Source
Description
Project Title: I-5: Columbia River Bridge Replacement :::: Project Description: Advance Post-Nepa Design and Construction Activities for the I-5 Interstate Bridge Replacement Over the Columbia River Between Oregon and Washington, Adjacent to the Existing Structure. Work Will Support Construction of New Bridges to Accommodate Highway, Transit, and Active Transportation Modes and Removal of the Existing Interstate Bridge. Replacing the Bridge Is Anticipated to Improve Traffic and Mobility for Freight and the Public Traveling Across the River. Early Project Design Is Covered Under Project Key 21570.