Single award · contract
Global Hawk LRIP Lot 10 Contract with Advance Procurement Long Lead
Award ID: FA862010C4000
A single federal award, with both ends of the trail linked.
$526.4M
Total award value
Award FA862010C4000 is a contract from the Department of Defense to Northrop Grumman Systems Corporation, $526.4M obligated, FY2010 to FY2020, for Global Hawk LRIP Lot 10 Contract with Advance Procurement Long Lead. The work is performed in California. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source
Agency ›
Department of Defense
Source
awarded→$526.4M
Award details
Award typeContract
PIIDFA862010C4000
Action date2010
Period123 mo
Awarding agencyDepartment of Defense →
Place of performanceCalifornia →
CategoryNAICS 336411PSC 1510
Competed?Not recordedSource
Total (exact)$526,385,363
More awards to Northrop Grumman Systems Corporation
awarded 2008$3.2B
awarded 2014$720.2M
awarded 2015$711.2M
awarded 2014$635M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.