Single award · contract

USN P-8A FRP II Long Lead Material

Award ID: N0001914C0067

A single federal award, with both ends of the trail linked.

$18.1B
Total award value

Award N0001914C0067 is a contract from the Department of Defense to The Boeing Company, $18.1B obligated, FY2014 to FY2027, for USN P-8A FRP II Long Lead Material. The work is performed in Washington. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source

Award details

Award typeContract
PIIDN0001914C0067
Action date2014
Period152 mo
Place of performanceWashington →
Competed?Not recordedSource
Total (exact)$18,111,838,530

More awards to The Boeing Company

awarded 2004$7.6B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.