Single award · contract
P-8A LRIP I Long Lead Material
Award ID: N0001909C0022
A single federal award, with both ends of the trail linked.
$5.7B
Total award value
Award N0001909C0022 is a contract from the Department of Defense to The Boeing Company, $5.7B obligated, FY2009 to FY2018, for P-8A LRIP I Long Lead Material. The work is performed in Washington. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source
Agency ›
Department of Defense
Source
awarded→$5.7B
Recipient ›
The Boeing Company
Source
performed in→
Award details
Award typeContract
PIIDN0001909C0022
Action date2009
Period111 mo
Awarding agencyDepartment of Defense →
RecipientThe Boeing Company →
Place of performanceWashington →
CategoryNAICS 336411PSC 1510
Competed?Not recordedSource
Total (exact)$5,699,021,641
More awards to The Boeing Company
awarded 2011$32B
awarded 2014$18.1B
awarded 2004$7.6B
awarded 2024$5.8B
awarded 2012$5.5B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.