US 322 & Chambers Hill RD
A single federal award, with both ends of the trail linked.
Award 693JJ22330000Y001PAT085211 is a grant from the Department of Transportation to Pennsylvania Department of Transportation, $35M obligated, for US 322 & Chambers Hill RD. The work is performed in Pennsylvania. Source
Description
Project Title: US 322 & Chambers Hill RD :::: Project Description: The SR 0322 and SR 2019 Grayson/SR 3006 Chambers Hill Road Signalized Intersection Is Being Reconstructed to 4 Approaches with Left Turn Lanes Removed from SR 0322. One Through Lane in Each Direction Is Added and SR 0322 Eb Left Turns Are Replaced Via a New SR 0322 Eb Jughandle with Signal at Witmer Road and SR 0322 WB Left Turns Are Replaced Via a New Roundabout with Bypass Lanes at the SR 2019 Milroy/Grayson Roads Intersection. Three Retaining Walls Accommodate the Widening and Geometry, Addition of Dynamic Message Signs, Stormwater Management Basins, Drainage, Guide Rail/Barrier, Signs and Pavement Markings Upgrades, and Other Miscellaneous Construction, for State Route 0322, Section 050, in Dauphin County, Swatara Township, from Mushroom Hill Road to Bridge Road at Segments 0090/2535 (0091/2574) to 0150/2314 (0151/2354), for an Overall Project Length of 12,797.00 Linear Feet (2.424 Miles).