Single award · contract

Three Future Lcac 100 Class Craft Long Lead Time Material

Award ID: N0002423C2452

FY2023 · complete year · data as of 2026-07-03

A single federal award, with both ends of the trail linked.

$1.4B
Total award value

Award N0002423C2452 is a contract from the Department of Defense to Textron Systems Corp, $1.4B obligated, FY2023 to FY2032, for Three Future Lcac 100 Class Craft Long Lead Time Material. The work is performed in Louisiana. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1905 (Combat Ships and Landing Vessels). Source

Award details

Award typeContract
PIIDN0002423C2452
Action date2023
Period98 mo
Place of performanceLouisiana →
Competed?Not recordedSource
Total (exact)$1,431,854,259

More awards to Textron Systems Corp

awarded 2016$685.9M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.