Single award · contract

Lcac 109 and 110 Long Lead Time Material

Award ID: N0002417C2480

A single federal award, with both ends of the trail linked.

$992.9M
Total award value

Award N0002417C2480 is a contract from the Department of Defense to Textron Systems Corp, $992.9M obligated, FY2017 to FY2029, for Lcac 109 and 110 Long Lead Time Material. The work is performed in Louisiana. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1905 (Combat Ships and Landing Vessels). Source

Award details

Award typeContract
PIIDN0002417C2480
Action date2017
Period143 mo
Place of performanceLouisiana →
Competed?Not recordedSource
Total (exact)$992,925,937

More awards to Textron Systems Corp

awarded 2016$685.9M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.