Single award · contract

T408 Lot 9 Long Lead Items

Award ID: N0001924C0019

FY2024 · complete year · data as of 2026-07-03

A single federal award, with both ends of the trail linked.

$649.5M
Total award value

Award N0001924C0019 is a contract from the Department of Defense to General Electric Company, $649.5M obligated, FY2024 to FY2032, for T408 Lot 9 Long Lead Items. The work is performed in Massachusetts. It is classified as NAICS 336412 (Aircraft Engine and Engine Parts Manufacturing) and PSC 2840 (Gas Turbines and Jet Engines, Aircraft, Prime Moving; and Components). Source

Award details

Award typeContract
PIIDN0001924C0019
Action date2023
Period105 mo
Place of performanceMassachusetts →
Competed?Not recordedSource
Total (exact)$649,498,869

More awards to General Electric Company

awarded 2011$1.2B
awarded 2017$698.8M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.