Advance Acquisition Contract- Long Lead Material for Lot 23 (FY2019) F414-GE-400 Engine

Award ID: N0001918C1061

A single federal award, with both ends of the trail linked.

$833.8M
Total award value

Award N0001918C1061 is a contract from the Department of Defense to General Electric Company, $833.8M obligated, FY2018 to FY2027, for Advance Acquisition Contract- Long Lead Material for Lot 23 (FY2019) F414-GE-400 Engine. The work is performed in Massachusetts. It is classified as NAICS 336412 (Aircraft Engine and Engine Parts Manufacturing) and PSC 2840 (Gas Turbines and Jet Engines, Aircraft, Prime Moving; and Components). Source

Description

Igf:ot:igf Advance Acquisition Contract- Long Lead Material for Lot 23 (FY2019) F414-GE-400 Engine

Award details

Award typeContract
PIIDN0001918C1061
Action date2018
Period101 mo
Place of performanceMassachusetts →
Competed?Not recordedSource
Total (exact)$833,800,020

More awards to General Electric Company

awarded 2011$1.2B
awarded 2017$698.8M
awarded 2023$649.5M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.