Single award · grant

Project Will Complete Preliminary Engineering (Including Trespassing Needsassessment), Final Design and…

Award ID: 69A36522403520CRSMI

FY2023 · complete year · data as of 2026-07-03

A single federal award, with both ends of the trail linked.

$15.6M
Total award value

Award 69A36522403520CRSMI is a grant from the Department of Transportation to Michigan Department of Transportation, $15.6M obligated, FY2023 to FY2028, for Project Will Complete Preliminary Engineering (Including Trespassing Needsassessment), Final Design…. The work is performed in Michigan. Source

Description

The Project Will Complete Preliminary Engineering (Including Trespassing Needsassessment), Final Design and Construction for Trespassing Prevention Relatedimprovements Along Mdot S Michigan Line Between Dearborn and Kalamazoo(line). The Project Will Prevent Trespassing at Several Locations in the Corridor,protect High Speed Train Operations of 90 MPH or Higher, and Improve Pedestriansafety at Existing at Grade Crossings. Specific Location of Improvements Will Beareas Where Trespassing Has Resulted in Strikes or Near Misses in the Past.

Award details

Award typeGrant
FAIN69A36522403520CRSMI
Action date2022
Period69 mo
Place of performanceMichigan →
Category—
Competed?Not recordedSource
Total (exact)$15,619,365

More awards to Michigan Department of Transportation

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.