Single award · contract

Procurement of V-22 Lot 17 Long Lead-Time Items

Award ID: N0001912C2001

A single federal award, with both ends of the trail linked.

$7.3B
Total award value

Award N0001912C2001 is a contract from the Department of Defense to Bell Boeing Joint Project Office, $7.3B obligated, FY2012 to FY2021, for Procurement of V-22 Lot 17 Long Lead-Time Items. The work is performed in Texas. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source

Award details

Award typeContract
PIIDN0001912C2001
Action date2011
Period117 mo
Place of performanceTexas →
Competed?Not recordedSource
Total (exact)$7,337,457,222

More awards to Bell Boeing Joint Project Office

awarded 2004$822.4M
awarded 2012$475.9M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.