Single award · contract
CMV-22 Production Lot 22 Long Lead-Time Items
Award ID: N0001917C0015
A single federal award, with both ends of the trail linked.
$7B
Total award value
Award N0001917C0015 is a contract from the Department of Defense to Bell Boeing Joint Project Office, $7B obligated, FY2017 to FY2027, for CMV-22 Production Lot 22 Long Lead-Time Items. The work is performed in Texas. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source
Award details
Award typeContract
PIIDN0001917C0015
Action date2016
Period124 mo
Awarding agencyDepartment of Defense →
RecipientBell Boeing Joint Project Office →
Place of performanceTexas →
CategoryNAICS 336411PSC 1510
Competed?Not recordedSource
Total (exact)$7,039,922,461
More awards to Bell Boeing Joint Project Office
awarded 2007$11B
awarded 2011$7.3B
awarded 2019$924.2M
awarded 2004$822.4M
awarded 2012$475.9M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.