Single award · contract

LRIP Lot IX F135 Propulsion Sytems for Long Lead-Time Items

Award ID: N0001914C0004

A single federal award, with both ends of the trail linked.

$1.5B
Total award value

Award N0001914C0004 is a contract from the Department of Defense to RTX Corporation, $1.5B obligated, FY2014 to FY2021, for LRIP Lot IX F135 Propulsion Sytems for Long Lead-Time Items. The work is performed in Connecticut. It is classified as NAICS 336412 (Aircraft Engine and Engine Parts Manufacturing) and PSC 2840 (Gas Turbines and Jet Engines, Aircraft, Prime Moving; and Components). Source

Award details

Award typeContract
PIIDN0001914C0004
Action date2014
Period85 mo
Place of performanceConnecticut →
Competed?Not recordedSource
Total (exact)$1,540,870,366

More awards to RTX Corporation

awarded 2001$7.9B
awarded 2023$6.6B
awarded 2020$4.9B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.