Single award · contract
Lot 12 AAC Long Lead for Propulsion Systems
Award ID: N0001918C1021
A single federal award, with both ends of the trail linked.
$8.7B
Total award value
Award N0001918C1021 is a contract from the Department of Defense to RTX Corporation, $8.7B obligated, FY2018 to FY2025, for Lot 12 AAC Long Lead for Propulsion Systems. The work is performed in Connecticut. It is classified as NAICS 336412 (Aircraft Engine and Engine Parts Manufacturing) and PSC 2840 (Gas Turbines and Jet Engines, Aircraft, Prime Moving; and Components). Source
Agency ›
Department of Defense
Source
awarded→$8.7B
Recipient ›
RTX Corporation
Source
performed in→
Award details
Award typeContract
PIIDN0001918C1021
Action date2018
Period81 mo
Awarding agencyDepartment of Defense →
RecipientRTX Corporation →
Place of performanceConnecticut →
CategoryNAICS 336412PSC 2840
Competed?Not recordedSource
Total (exact)$8,688,654,907
More awards to RTX Corporation
awarded 2001$7.9B
awarded 2020$7.5B
awarded 2023$6.6B
awarded 2020$4.9B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.