Single award · contract

LRIP Lot 1 Long Lead Materials

Award ID: N0001922C0048

FY2022 · complete year · data as of 2026-07-11

A single federal award, with both ends of the trail linked.

$59.4M
Total award value

Award N0001922C0048 is a contract from the Department of Defense to The Boeing Company, $59.4M obligated, FY2022 to FY2030, for LRIP Lot 1 Long Lead Materials. The work is performed in Missouri. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1550 (Unmanned Aircraft). Source

Award details

Award typeContract
PIIDN0001922C0048
Action date2022
Period86 mo
Place of performanceMissouri →
Competed?Not recordedSource
Total (exact)$59,447,000

More awards to The Boeing Company

awarded 1999$9B
awarded 2008$7.2B
awarded 2018$5.5B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.