Single award · contract

Lot 91 Production Long Lead Items

Award ID: N0001919C0016

A single federal award, with both ends of the trail linked.

$990.6M
Total award value

Award N0001919C0016 is a contract from the Department of Defense to The Boeing Company, $990.6M obligated, FY2019 to FY2026, for Lot 91 Production Long Lead Items. The work is performed in Missouri. It is classified as NAICS 336414 (Guided Missile and Space Vehicle Manufacturing) and PSC 1410 (Guided Missiles). Source

Award details

Award typeContract
PIIDN0001919C0016
Action date2018
Period92 mo
Place of performanceMissouri →
Competed?Not recordedSource
Total (exact)$990,630,605

More awards to The Boeing Company

awarded 1999$9B
awarded 2008$7.2B
awarded 2018$5.5B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.