Single award · contract
Long Lead-Time Items
Award ID: N0001912C0004
A single federal award, with both ends of the trail linked.
$5.6B
Total award value
Award N0001912C0004 is a contract from the Department of Defense to Lockheed Martin Corporation, $5.6B obligated, FY2012 to FY2026, for Long Lead-Time Items. The work is performed in Texas. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source
Agency ›
Department of Defense
Source
awarded→$5.6B
Recipient ›
Lockheed Martin Corporation
Source
performed in→
Award details
Award typeContract
PIIDN0001912C0004
Action date2012
Period164 mo
Awarding agencyDepartment of Defense →
RecipientLockheed Martin Corporation →
Place of performanceTexas →
CategoryNAICS 336411PSC 1510
Competed?Not recordedSource
Total (exact)$5,597,451,611
More awards to Lockheed Martin Corporation
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2019$30.2B
awarded 2015$12.3B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.