Single award · contract
F-35A LRIP 15 USAF Aircraft Long Lead Funding
Award ID: N0001920C0009
FY2020 · complete year · data as of 2026-07-12
A single federal award, with both ends of the trail linked.
$30.2B
Total award value
Award N0001920C0009 is a contract from the Department of Defense to Lockheed Martin Corporation, $30.2B obligated, FY2020 to FY2028, for F-35A LRIP 15 USAF Aircraft Long Lead Funding. The work is performed in Texas. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source
Agency ›
Department of Defense
Source
awarded→$30.2B
Recipient ›
Lockheed Martin Corporation
Source
performed in→
Description
The Purpose of This Modification Is to Award F-35A LRIP 15 USAF Aircraft* Long Lead Funding
Award details
Award typeContract
PIIDN0001920C0009
Action date2019
Period102 mo
Awarding agencyDepartment of Defense →
RecipientLockheed Martin Corporation →
Place of performanceTexas →
CategoryNAICS 336411PSC 1510
Competed?Not recordedSource
Total (exact)$30,154,748,689
More awards to Lockheed Martin Corporation
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2015$12.3B
awarded 2015$10.6B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.