Description
Project Title: I-80: MM0 to MM5 Reconstruct :::: Project Description: This Project Is the Construction of Approximately 5.82 Miles of State Highway from SR 0080/SEGMENT 0002/OFFSET 0000 to SR 0080/SEGMENT 0060/OFFSET 0297, Including Asphalt Paving, Stone Matrix Asphalt Paving, Plain Cement Concrete Paving, Accelerated Concrete Pavement Patching, Milling, Diamond Grinding, Drainage Improvements, Guiderail Improvements, Right-Of-Way Fencing, Concrete Curb, Topsoil, Seeding/Mulching, Temporary Erosion Controls, Highway Lighting, Signing, Delineation, Pavement Markings, Bridge Repairs, Its Devices, Design and Construction of Traffic Control, and Construction of Single 96' Span PA Bulb-Tee Bridge Over SR 0318, as Indicated on the Approved Drawings Included in the Bid Package.