I-70: Bentleyville to PA 519
FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†
† DoD contract data posts to USAspending about 90 days after award.
A single federal award, with both ends of the trail linked.
Award 693JJ22630000Y001PAT124331 is a grant from the Department of Transportation to Pennsylvania Department of Transportation, $18.4M obligated, FY2026 to FY2029, for I-70: Bentleyville to PA 519. The work is performed in Pennsylvania. Source
Description
Project Title: I-70: Bentleyville to PA 519 :::: Project Description: The Description and Location of the Project Is as Follows: 2'(INCH) and 4'(INCH) Milling and Resurfacing of SR 0070 Mainline and Shoulders, 2'(INCH) Milling and Overlay of Ramps at SR 8022 (Eighty Four Interchange), SR 8024 (Dunningsville Interchange) and SR 8026 (Kammerer Interchange), Asphalt Patching, Drainage, Signing, Delineation, Rock Slope Repair and Guide Rail on a 4 Lane Roadway and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 70 Section 32M in Somerset & North Strabane Townships, Washington County from Segment 0240 Offset 0297 Eb / Segment 0241 Offset 0297 WB to Segment 0314 Offset 2292 Eb / Segment 0315 Offset 2292 Wb.