I-475 Flint River to Carpenter Road
A single federal award, with both ends of the trail linked.
Award 693JJ22430000Y800MI23A1031 is a grant from the Department of Transportation to Michigan Department of Transportation, $29.1M obligated, for I-475 Flint River to Carpenter Road. The work is performed in Michigan. Source
Description
Project Title: I-475 Flint River to Carpenter Road :::: Project Description: Road Reconstruction and Bridge Replacement, Bridge Removal, Deck Replacement, Overlay - Deep, Overlay - Epoxy and Substructure Patching Flint River to Carpenter Road and 13 Structures on I-4752637 B05-25132 I-475 Over Flint R,w Blvd&r Side DR (STR 2637 to Be Replaced with STR 14607 and STR 14608)2647R03-25132I-475 Over CSX RR and Pierson RD2674S24-25132I-475 Over Leith STREET2675S25-25132I-475 Over Stewart AVE2676S26-25132I-475 Over Ramp C I-4752677S27-25132I-475 Over Horton AVE2678S29-25132CARPENTER Road Over I-4752693S45-25132I-475 Ramp Over Horton AVE2694S46-25132I-475 Ramp B Over I-4752695S47-25132I-475 Off to Selby Over Selby to I-475 SB on RP2696S48-25132RAMP E (I-475) Over Ramp F I-4752698S50-25132I-475 Over Massachusetts AVE.2699S51-25132RUSSELL Ave Over I-475