Single award · contract

FY14 Trident Production Long Lead Material

Award ID: N0003013C0100

A single federal award, with both ends of the trail linked.

$763.5M
Total award value

Award N0003013C0100 is a contract from the Department of Defense to Lockheed Martin Corp, $763.5M obligated, FY2013 to FY2019, for FY14 Trident Production Long Lead Material. The work is performed in California. It is classified as NAICS 336414 (Guided Missile and Space Vehicle Manufacturing) and PSC 1420 (Guided Missile Components). Source

Award details

Award typeContract
PIIDN0003013C0100
Action date2013
Period62 mo
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$763,491,130

More awards to Lockheed Martin Corp

awarded 2001$9B
awarded 2000$6.1B
awarded 2008$3.4B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.