Single award · contract

GEO-3 and HEO-3 Long Lead

Award ID: FA881008C0002

A single federal award, with both ends of the trail linked.

$3.4B
Total award value

Award FA881008C0002 is a contract from the Department of Defense to Lockheed Martin Corp, $3.4B obligated, FY2008 to FY2022, for GEO-3 and HEO-3 Long Lead. The work is performed in California. It is classified as NAICS 336414 (Guided Missile and Space Vehicle Manufacturing) and PSC 1810 (Space Vehicles). Source

Award details

Award typeContract
PIIDFA881008C0002
Action date2008
Period173 mo
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$3,394,759,310

More awards to Lockheed Martin Corp

awarded 2001$9B
awarded 2000$6.1B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.