Single award · contract
FY12 Long Lead Material
Award ID: N0003012C0100
A single federal award, with both ends of the trail linked.
$1.1B
Total award value
Award N0003012C0100 is a contract from the Department of Defense to Lockheed Martin Corp, $1.1B obligated, FY2012 to FY2017, for FY12 Long Lead Material. The work is performed in California. It is classified as NAICS 336414 (Guided Missile and Space Vehicle Manufacturing) and PSC 1420 (Guided Missile Components). Source
Agency ›
Department of Defense
Source
awarded→$1.1B
Recipient ›
Lockheed Martin Corp
Source
performed in→
Award details
Award typeContract
PIIDN0003012C0100
Action date2011
Period70 mo
Awarding agencyDepartment of Defense →
RecipientLockheed Martin Corp →
Place of performanceCalifornia →
CategoryNAICS 336414PSC 1420
Competed?Not recordedSource
Total (exact)$1,119,221,474
More awards to Lockheed Martin Corp
awarded 2001$9B
awarded 2000$6.1B
awarded 2006$5.8B
awarded 2008$3.4B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.