Single award · contract

F15EX Lot 2 Long Lead-Items

Award ID: FA863421F0023

FY2021 · complete year · data as of 2026-07-12

A single federal award, with both ends of the trail linked.

$1.1B
Total award value

Award FA863421F0023 is a contract from the Department of Defense to The Boeing Company, $1.1B obligated, FY2021 to FY2028, for F15EX Lot 2 Long Lead-Items. The work is performed in Missouri. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source

Award details

Award typeContract
PIIDFA863421F0023
Action date2021
Period77 mo
Place of performanceMissouri →
Competed?Not recordedSource
Total (exact)$1,117,198,124

More awards to The Boeing Company

awarded 1999$9B
awarded 2008$7.2B
awarded 2018$5.5B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.