TheFiscalFinder
Single award · grant

Exit 161 Bellefonte Interchange

A single federal award, with both ends of the trail linked.
$48.4M
total award value
action date
period
693JJ22440000L54EPAX021461
FAIN

Description

Project Title: Exit 161 Bellefonte Interchange :::: Project Description: For the Construction of a High-Speed Interchange Between I-99 and I-80 at the Existing Exit 161 in Centre County, Spring and Marion Townships, Commonwealth of Pennsylvania State Route 0080, Section B18 at the Locations as Follows: State Route 0080 from Segment 1584 Offset 0536 to Segment 1620 Offset 2312. State Route 0080 from Segment 1585 Offset 0302 to Segment 1625 Offset 0744. Also Including State Routes: SR 0099 and SR 1018. Work Includes the Design of 3 Design-Build Multi-Span Continuous Composite Curved Steel Girder Bridges, 4 Walls, 5 Box Culverts, 7 Sign Structures, and 3 DMS Boards. Construction Includes New and Rebuilt Roadway and Ramps Involving Base, Binder, and Wearing Courses, Drainage System Improvements, Its Devices, Guide Rail, Pavement Markings, Stream Improvements, Highway Lighting, and Miscellaneous Construction as Indicated on the Approved Drawings for a Total Construction Length of Approximately 40,921 Feet (7.75 Miles).

Place of performancePennsylvania
Category
Competed?Not recorded✓ from source
Total (exact)$48,379,341

More awards to Pennsylvania Department of Transportation

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.