Exit 161 Bellefonte Interchange
Description
Project Title: Exit 161 Bellefonte Interchange :::: Project Description: For the Construction of a High-Speed Interchange Between I-99 and I-80 at the Existing Exit 161 in Centre County, Spring and Marion Townships, Commonwealth of Pennsylvania State Route 0080, Section B18 at the Locations as Follows: State Route 0080 from Segment 1584 Offset 0536 to Segment 1620 Offset 2312. State Route 0080 from Segment 1585 Offset 0302 to Segment 1625 Offset 0744. Also Including State Routes: SR 0099 and SR 1018. Work Includes the Construction of 3 Design-Build Multi-Span Continuous Composite Curved Steel Girder Bridges, Also Construction of 7 Additional Bridges and Miscellaneous Construction as Indicated on the Approved Drawings for a Total Construction Length of Approximately 40,921 Feet (7.75 Miles).