Single award · grant

Design Build Widening of I-26 FR MM 85 (Little Mountain, Exit 85-SC 202) to MM 101 (Irmo, Exit 101- US 176)…

Award ID: 45P029208Z001

A single federal award, with both ends of the trail linked.

$129.6M
Total award value

Award 45P029208Z001 is a grant from the Department of Transportation to South Carolina Department of Transportation, $129.6M obligated, for Design Build Widening of I-26 FR MM 85 (Little Mountain, Exit 85-SC 202) to MM 101 (Irmo, Exit 101…. The work is performed in South Carolina. Source

Description

Design Build Widening of I-26 FR MM 85 (Little Mountain, Exit 85-SC 202) to MM 101 (Irmo, Exit 101- US 176) - Richland, Newberry &

Award details

Award typeGrant
FAIN45P029208Z001
Action date—
Period—
Place of performanceSouth Carolina →
Category—
Competed?Not recordedSource
Total (exact)$129,561,720

More awards to South Carolina Department of Transportation

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.