● Single award · grant
Design Build Bridge Replacement I-95 NB & SB Over Lake Marion
FY2022 · complete year · data as of 2026-07-11
A single federal award, with both ends of the trail linked.
$149.3M
total award value
2022
action date
138 mo
period
693JJ22530000Y001SCP041130
FAIN
Description
Project Title: Design Build Bridge Replacement I-95 NB & SB Over Lake Marion :::: Project Description: Design Build Bridge Replacement I-95 NB & SB Over Lake Marion Moas 57-25 and 5-28
Awarding agencyDepartment of Transportation →
Place of performanceSouth Carolina →
Category—
Competed?Not recordedSource
Total (exact)$149,321,039
More awards to South Carolina Department of Transportation
More from Department of Transportation
awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
awarded 2020$4B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.