Single award · contract

CVN 79 Emals Long Lead Time Material

Award ID: N0001914C0037

A single federal award, with both ends of the trail linked.

$1.8B
Total award value

Award N0001914C0037 is a contract from the Department of Defense to General Atomics, $1.8B obligated, FY2014 to FY2030, for CVN 79 Emals Long Lead Time Material. The work is performed in California. It is classified as NAICS 336413 (Other Aircraft Parts and Auxiliary Equipment Manufacturing) and PSC 1720 (Aircraft Launching Equipment). Source

Award details

Award typeContract
PIIDN0001914C0037
Action date2014
Period188 mo
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$1,757,180,413

More awards to General Atomics

awarded 2003$928.2M
awarded 2009$710.8M
awarded 2004$590.2M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.