Work Required Is for Phase II of B.f. Sisk Dam Sod Modifications

A single federal award, with both ends of the trail linked.
$257.3M
total award value
2025
action date
47 mo
period
140R2025C0004
PIID

Description

The Work Required Is for Phase II of B.f. Sisk Dam Sod Modifications.

Place of performanceCalifornia
Competed?Not recorded✓ from source
Total (exact)$257,269,309

More awards to NW Construction, Inc

More from Department of the Interior

🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.