TheFiscalFinder
● Single award · grant

Widening PR-100, from Int

FY2025 · complete year · data as of 2026-09-01

A single federal award, with both ends of the trail linked.
$38.6M
total award value
2025
action date
71 mo
period
693JJ22540000YP20PR0100014
FAIN

Description

Project Title: Widening PR-100, from Int. PR-308(KM 8.4) to PR-101(KM 14.7) Inc. Bicycle Lane, Municipality of Cabo Rojo :::: Project Description: The Proposed Works Consist of the Widening of Existing Highway PR-100 and the Construction of Bicycle Lanes Along Both Traffic Directions of the Road. The Proposed Works Include the Construction of a Pre Cast Box Culvert, Reinforced Concrete Retaining Walls, Mse Gabion Wall, Pipe and Waterways Drainage Improvements, Headwalls, Cold Milling, Asphalt Pavement Preservation, Sidewalks, Rip Rap, Traffic Delineators, Erosion Control Measures, Milled Shoulder Rumble Strips (Msrs), Signing and Pavement Markings, W-Beam Guard Rail, Traffic Signal Systems Improvements, Electrical Utilities, Maintenance and Protection of Traffic and Other Miscellaneous Works as Shown on Plans.

Place of performancePuerto Rico →
Category—
Competed?Not recordedSource
Total (exact)$38,606,312

More awards to Puerto Rico Highway & Transportation Authority

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.