● Single award · contract
Western Matoc Task Order for the Design-Build (D-B) of Rio Grande Valley (Rgv) Sector 08 Border…
A single federal award, with both ends of the trail linked.
$126.2M
total award value
2019
action date
47 mo
period
W9126G19F6147
PIID
Description
Western Matoc Task Order for the Design-Build (D-B) of Rio Grande Valley (Rgv) Sector 08 Border Infrastructure Construction Project at Rio Grande City and Mcallen,tx.
Awarding agencyDepartment of Defense →
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceTexas →
CategoryNAICS 237310PSC Y1LB
Competed?Not recorded✓ from source
Total (exact)$126,236,579
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.1B
awarded 2017$34.9B
awarded 2001$34.2B
awarded 2011$32B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.