Westchester County Bridges: Hrp, Smrp, Route 1
Description
Project Title: Westchester County Bridges: Hrp, Smrp, Route 1 :::: Project Description: East Lincoln Ave Over the Hutchinson River Bridge Replacement - This Project Will Replace and Elevate the Bridges That Carry the East Lincoln Avenue Over the Hutchinson River Parkway and Raise the Elevation of a 1200 Foot Long Section of the Hutchinson River Parkway Above the Future Flood Level. This Project Will Alleviate the Flooding That Causes the Hutchinson River Parkway to Be Closed That Causes Major Traffic Diversions and Congestion in Mount Vernon and the Pelhams and Will Enhance Accessibility in Emergency Situations Within the City of Mount Vernon, Town of Pelham, Westchester County. Funding Is Split on Stip Between 8101.46, 8216.84 and 8473.14. Bins 3348300, 5500100, 1000040 (from 8473.14), 5500839 (from 8216.84), and 5500859 (from 8216.84). This Project Will Be Let as Design Build.