TheFiscalFinder
Single award · grant

Waterbury; Rehabilitation of Bridges (No Added Capacity) in the Route 8/I-84 Interchange Area (Cn)

A single federal award, with both ends of the trail linked.
$63.1M
total award value
action date
period
090008134Z510
FAIN

Description

Waterbury; Rehabilitation of Bridges (No Added Capacity) in the Route 8/I-84 Interchange Area (Cn).

Place of performanceConnecticut
Category
Competed?Not recorded✓ from source
Total (exact)$63,106,295

More awards to Department of Transportation Connecticut

awarded 2023$311.6M

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.