TheFiscalFinder
Single award · grant

US 113 at SR 20 Grade Separated Intersection

A single federal award, with both ends of the trail linked.
$34.3M
total award value
action date
period
693JJ22330000Y001DES113027
FAIN

Description

Project Title: US 113 at SR 20 Grade Separated Intersection :::: Project Description: This Project Scope Consists of a Grade Separation at the US 113/ SR 20 Intersection Located Just North of Millsboro, Delaware. The Grade Separation Includes a Partial Cloverleaf Configuration with Loop Ramps in the Northeast and Southwest Quadrants with Signals at the Ramp Terminals, a Bridge Structure, Drainage Improvements, and Multimodal Facilities. Also, Unsignalized Median Crossovers Will Be Removed on US 113 South of the US 113/ SR 20 Intersection Within the Project's Limits.

Place of performanceDelaware
Category
Competed?Not recordedSource
Total (exact)$34,284,675

More awards to Transportation, Delaware Department of

awarded 2022$63.2M

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.