Single award · contract

Uca Long Lead Materials and Services

Award ID: M6785425C0023

FY2025 · complete year · data as of 2026-09-01

A single federal award, with both ends of the trail linked.

$291.6M
Total award value

Award M6785425C0023 is a contract from the Department of Defense to Kongsberg Defence & Aerospace as, $291.6M obligated, FY2025 to FY2029, for Uca Long Lead Materials and Services. The work is performed in Pennsylvania. It is classified as NAICS 336992 (Military Armored Vehicle, Tank, and Tank Component Manufacturing) and PSC 2355 (Combat, Assault, and Tactical Vehicles, Wheeled). Source

Award details

Award typeContract
PIIDM6785425C0023
Action date2024
Period49 mo
Place of performancePennsylvania →
Competed?Not recordedSource
Total (exact)$291,637,687

More awards to Kongsberg Defence & Aerospace as

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.