Single award · contract

U.S. Route 1 (Richmond Highway) Improvements Limits Are Located from the Telegraph Road Intersection with…

Award ID: DTFH7113C00030

A single federal award, with both ends of the trail linked.

$82.8M
Total award value

Award DTFH7113C00030 is a contract from the Department of Transportation, $82.8M obligated, FY2013 to FY2020, for U.S. Route 1 (Richmond Highway) Improvements Limits Are Located from the Telegraph Road…. The work is performed in Virginia. It is classified as NAICS 237310 (Highway, Street, and Bridge Construction) and PSC Y1LB (Construction of Highways, Roads, Streets, Bridges, and Railways). Source

Description

Igf::ot::igf the U.S. Route 1 (Richmond Highway) Improvements Limits Are Located from the Telegraph Road Intersection with U.S. Route 1 (Located 1.6 Miles East of Fairfax County Parkway Intersection with U.S. Route 1) to the Intersection of New Mulligan Road (Old Mill Road) with U.S. Route 1 and Mt. Vernon Highway, Representing Approximately 3.4 Miles of Roadway Widening from Four Lanes to Six, and Including Left and Right Turn Lanes at Intersecting Roadways, and Other Improvements.

Award details

Award typeContract
PIIDDTFH7113C00030
Action date2013
Period89 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceVirginia →
Competed?Not recordedSource
Total (exact)$82,805,571

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.