TheFiscalFinder
Single award · contract

U.S. Route 1 (Richmond Highway) Improvements Limits Are Located from the Telegraph Road Intersection with…

A single federal award, with both ends of the trail linked.
$82.8M
total award value
2013
action date
89 mo
period
DTFH7113C00030
PIID

Description

Igf::ot::igf the U.S. Route 1 (Richmond Highway) Improvements Limits Are Located from the Telegraph Road Intersection with U.S. Route 1 (Located 1.6 Miles East of Fairfax County Parkway Intersection with U.S. Route 1) to the Intersection of New Mulligan Road (Old Mill Road) with U.S. Route 1 and Mt. Vernon Highway, Representing Approximately 3.4 Miles of Roadway Widening from Four Lanes to Six, and Including Left and Right Turn Lanes at Intersecting Roadways, and Other Improvements.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceVirginia
Competed?Not recorded✓ from source
Total (exact)$82,805,571

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.