Single award · contract
TI-08 Long Lead Material
Award ID: N0002408C6297
A single federal award, with both ends of the trail linked.
$88.7M
Total award value
Award N0002408C6297 is a contract from the Department of Defense to General Dynamics Mission Systems, Inc., $88.7M obligated, FY2008 to FY2020, for TI-08 Long Lead Material. The work is performed in Virginia. It is classified as NAICS 334515 (Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals) and PSC 1904 (Submarines). Source
Award details
Award typeContract
PIIDN0002408C6297
Action date2008
Period140 mo
Awarding agencyDepartment of Defense →
Place of performanceVirginia →
CategoryNAICS 334515PSC 1904
Competed?Not recordedSource
Total (exact)$88,665,568
More awards to General Dynamics Mission Systems, Inc.
awarded 2024$215.6M
awarded 2018$206M
awarded 2019$187.5M
awarded 2024$95.4M
awarded 2019$91.8M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.