Single award · contract

THAAD FMS KSA Phase I Long Lead Items, Obsolescence, Tooling and Test Equipment, Key Personnel, Line…

Award ID: HQ014719C0007

A single federal award, with both ends of the trail linked.

$1.1B
Total award value

Award HQ014719C0007 is a contract from the Department of Defense to Lockheed Martin Corporation, $1.1B obligated, FY2019 to FY2027, for THAAD FMS KSA Phase I Long Lead Items, Obsolescence, Tooling and Test Equipment, Key Personnel…. The work is performed in Texas. It is classified as NAICS 336414 (Guided Missile and Space Vehicle Manufacturing) and PSC H914 (Other QC/Test/Inspect- Guided Missiles). Source

Description

THAAD FMS KSA Phase I Long Lead Items, Obsolescence, Tooling and Test Equipment, Key Personnel, Line Requalification Activities, Initial Training Development, System Integration Lab and Testbeds, Three-Level Maintenance Concept, Exportability, and Early Engineering Development.redesign

Award details

Award typeContract
PIIDHQ014719C0007
Action date2019
Period101 mo
Place of performanceTexas →
Competed?Not recordedSource
Total (exact)$1,075,010,333

More awards to Lockheed Martin Corporation

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.