● Single award · grant
Sum Ir 0076/0077 8.42/09.74
A single federal award, with both ends of the trail linked.
$40.9M
total award value
—
action date
—
period
693JJ22230000Y001OHE180428
FAIN
Description
Project Title: Sum Ir 0076/0077 8.42/09.74 :::: Project Description: Summit County. Improvements to the Akron Beltway Freeway System Along Ir 76/77 Including Work on the Kenmore Leg, West Leg, Central Interchange, and South Leg. Project Includes Pavement Replacement on the West Leg and South Leg Along with Miscellaneous Bridge Work. Central Interchange Segment Includes Reconstruction of Two Left-Handed Exits, Bridge Work, Pavement Replacement and Noise Walls. Kenmore Leg Segment Includes Pavement/Shoulder Work, Miscellaneous Bridge Work, Ramp Work at the SW and NW Interchanges, and Possible Noise Walls.
Awarding agencyDepartment of Transportation →
RecipientOhio Department of Transportation →
Place of performanceOhio →
Category—
Competed?Not recorded✓ from source
Total (exact)$40,919,432
More awards to Ohio Department of Transportation
More from Department of Transportation
awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
awarded 2020$4B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.