Single award · contract

SSN 814 & SSN 815 Long Lead Time Material

Award ID: N0002424C2110

FY2024 · complete year · data as of 2026-07-03

A single federal award, with both ends of the trail linked.

$7B
Total award value

Award N0002424C2110 is a contract from the Department of Defense to Electric Boat Corporation, $7B obligated, FY2024 to FY2035, for SSN 814 & SSN 815 Long Lead Time Material. The work is performed in Connecticut. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1905 (Combat Ships and Landing Vessels). Source

Award details

Award typeContract
PIIDN0002424C2110
Action date2023
Period143 mo
Place of performanceConnecticut →
Competed?Not recordedSource
Total (exact)$7,041,693,031

More awards to Electric Boat Corporation

awarded 2003$9.4B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.